0 ratings
Aquapro 69716 9.5 Long Lead Free Packaged Magnesium Anode Rod with 34 Male Pipe Thread
Significantly Extends The Water Heater Tank Life.
Aquapro 69716 9.5 Long Lead Free Packaged Magnesium Anode Rod with 34 Male Pipe Thread
Item #: 116591751

Aquapro 69716 9.5 Long Lead Free Packaged Magnesium Anode Rod with 34 Male Pipe Thread

Item #: 116591751

JMD 3531

Price Details

Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )

*All items will import from US

0 ratings Write a review
In stock
us Imported from USA store

QTY:

Order now and get it around Saturday, August 08
Our Top Logistics Partners
  • fedex
  • dhl
Significantly Extends The Water Heater Tank Life.
U-Care Warranty:
None
Select a Plan
fast shipping

Fast
Shipping

free return

Free
Return*

secure packaging

Secure Packaging

100% original products

100% Original Products

pci-dss

PCI DSS Compliance

iso certified

ISO 27001 Certified


paypal payment
visa payment
mastercard payment

What Stands Out

Lead-Free Material
Crafted from a lead-free composition, ensuring safe water quality for your family while providing excellent corrosion resistance, outpacing traditional rods.
Durable Design
The 9.5'' length and robust construction offer enhanced longevity and performance, effectively protecting your water heater from harmful sediments.
Easy Installation
Equipped with a standard 3/4" male pipe thread, this anode rod fits most water heaters seamlessly, making installation quick and hassle-free.

Product Details

Shop Aquapro 69716 9.5 Long Lead Free Packaged Magnesium Anode Rod with 34 Male Pipe Thread online at a best price in Jamaica. B0085IJXNO
Item Weight1 lbs (450 grams)

Who Should Buy?

Suitable For
  • Homeowners

    Ideal for homeowners seeking to prolong the life of their water heaters by preventing corrosion effectively.

  • DIY Enthusiasts

    Great for DIYers who want to replace anode rods themselves to improve water heater performance.

  • Eco-Conscious Users

    Suitable for environmentally aware consumers looking for lead-free, eco-friendly components in their plumbing systems.

Not Suitable For
  • Professional Plumbers

    May not be suited for plumbers seeking specialized or custom solutions beyond standard replacement options.

Product Description

Aquapro 69716 9.5 Long Lead Free Packaged Magnesium Anode Rod with 34 Male Pipe Thread

Have any Query? Chat with us

Customer Questions & Answers

  • Question: What types of water heaters is this anode compatible with?

    Answer: It is specifically designed for Suburban and Morflo water heaters.
  • Question: How does the magnesium anode rod work?

    Answer: It attracts the elements that cause corrosion, protecting the tank.
  • Question: How often should I replace the anode rod?

    Answer: It is recommended to check the anode rod every 1-2 years and replace it as needed.

Aquapro Water Heater Parts Editorial Review

No editorial reviews found

Customer Reviews & Ratings

4.0
1 customers ratings
  • 5 Star
    0%
  • 4 Star
    100%
  • 3 Star
    0%
  • 2 Star
    0%
  • 1 Star
    0%

Review this product

Share your thoughts with other customers

Platform Trust & Buyer Confidence

trustpilot logo
4.3/5 9200 + reviews
Read reviews
MA
Mohammad
Verified buyer

“Excellent quality and original too,when ubuy send original things I will appreciate that ,I very satisfied thank you”

23 July 2026 · via Trustpilot
CK
Chitra
Verified buyer

“The order and delivery progress was communicated very well. Package arrived within the estimated time. Products arrived as expected in good condition.”

22-Jul-26 · via Trustpilot
K
kund
Verified buyer

“Good supply of products. Safe payment methods, and shipment worldwide! Genuine products.”

23-Jul-26 · via Trustpilot
OO
Onesi
Verified buyer

“Was my first time buying a product from Ubuy, but I found it so helpful. This is reliable. Gonna place a new order!”

22 July 2026 · via Trustpilot
SJ
SAO JOHN
Verified buyer

“Ubuy is a great online platform to buy stuff. Reliable, fast delivery time and great value for money. I've been using Ubuy online shopping platform for three years now and will continue to do so.”

23 July 2026 · via Trustpilot
Secure Checkout Global Delivery Easy Returns Genuine Products

Product Price History

Important information

  • Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
  • Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.